Projects
Recent:
• Curriescamp low water bridge
• Soverby low water bridge
• Bella Rosa phase 1B
• Bella Rosa phase 1A
• Bokpoort Drainage Channels
• Droogehout Tonnes
• Khi Solar Rehab
• Khi Solar Supply Chain
• Khi Solar Electrical Power block
• Klk Paving
• Klk Washbay
• Upgrading of Olifantshoek street
• Earthworks Ruwacon Paballelo crossing
• Pecan nuts JC Strauss
• Raap/Skraap 23km Enterance road
• Removal of rubble from Upington Airport
• Witbank de-bushing and de-stumping
• Flood Embankment works
• Pre stress development
• Khara Hais link road
• Slurry of KHI access road
• Reseal of Upington streets
• Resurfacing parking area Kalahari Centre Upington
• Airport Plinths Upington
• Fanie Malan paving of playground
• Solar field thermal camera cable installation
Since 2006:
Periodic Maintenance (Reseal) of National Route 10 section 11
• Regravelling of road (DR 3331) Olifantshoek
• Soverby Curriescamp
• Tweerivieren paving
• UAP Road phase ll
• Upgrading of road 3322-Karakoel road
• Lambrechtsdrift (KM 61.10) and Upington (KM 116.68)
• The periodic maintenance (Reseal) of National Route 14 section 5 between Upington (KM 7.6) & Boplaas (KM 94.2)
• Reconstruction of Basecourse of certain street at Vredesvallei – Riemvasmaak
• Triple D Farms dam ll
• National Route 10 section 12-KM 60.98 and Nakop (KM 134.17)
• Upgrade of national route 14 section 4 – Keimoes to Upington
• Construction of entrance road , Paballelo
• Upgrade of national route Groblershoop to Lambrechtsdrift
• STS Wild – landing strip